Rapid cooling of hot bones trimmings – stage 4
07 June 2024
Focus area: Food safety
Program stream: Product & process integrity
Project number: 2022-1044
As part of the project, the tunnel was tested using different flow rates, nozzle configuration and belt speeds to reach optimal results.
The tunnel is now in full production and operating as design with desired cooling rates achieved.